GRD is an Algerian-French joint venture: 65% owned by the Algerian Labelle Group / 35% held by the French group Cristal-Union. Its construction began in 2011, under the supervision of Cristal Union, which brings its expertise on the project.
The GRD refinery, in commercial production since March 1, 2016, produces 1000 T / day of refined sugar from imports of Brazilian brown sugar.

As part of this project, GRD labelle entrusted Domea with a support mission during commissioning, and operation of the plant for activities related to utilities, maintenance and extension works of the factory.

algerie

Our missions

Support to Utilities Service (Water Treatment, Boiler House, turbine-generator unit, Diesel Engine Generators, Effluent treatment)

  • Commissioning assistance
  • Recruitment assistance, training, organization, setting up procedures, setting up and supporting supervision staff

Support to the maintenance department

  • For electrical service: assistance in recruiting, training, organizing, setting up and supporting supervisory staff.
  • Organization of the interventions of companies, follow-up of technical shutdowns
  • Implementation of maintenance contracts with specialized companies

Projects of extensions of the factory, new workshops, adaptations

  • Local coordination of companies and suppliers
  • Monitoring works on site
  • Interface with the engineering office in charge of projects based in France

Site specificities

  • Production 1000T / day white sugar
  • Boiler 50 T / hour
  • Turbine-generator 6.3MVA
  • Engine Generator 1900kVA